
Sample Workparty Agenda
7:30am- 8am Breakfast with Organizers
8:00am- 8:30am Set out food and drinks
8:30am- 9am Prepare all hands-on projects with specific tools/materials, safety protocol etc.
9am- 9:30am Sign-in
9:30am- 10am Circle up intros from organizers and participants
10am- 12:30am Hands on Projects Round 1
- Sheet Mulching (Stephanie)
- Need Cardboard, Mulch, 3 shovels, wheelbarrow
- Rain Garden Planting (Zach)
- Need 5 shovels, digging fork, hard rake, wheelbarrow, pruners
- Planting Oak Tree (Marian)
- Need 3 shovels, 2 hard rakes, pitch fork)
12:30- 1:30 Lunch!
- Introduce foods and cooks
- Orient Compost Waste, Dishes, etc
1:30- 4 Hands-on Projects Round 2
- Complete Sheet Mulching
- Need Covercrop
- Mulch Rain Garden
- Need woodchips, wheelbarrow, shovels
- Mulch Oak Tree
- Gather Leaves/Straw
4- 4:30 Gather ‘round for closing
4:30- 5/5:30 Clean Up
- Clean tools and store away!
- Account for all Materials that were loaned
- Collect all gloves
- Return wheelbarrow